More construction of the house than aerated concrete can be done after the foundation is built. Usually zero cycle is done in the first summer season and canned until the next hot season.
More construction of the house than aerated concrete can be done after the foundation is built. Usually zero cycle is done in the first summer season and canned until the next hot season.
 
At first, with the indispensable monitoring of a single horizontal area of ​​all surfaces, a brick basement wall is laid on the upper concrete edge floor position line. Waterproofing measures are applied (mostly two layers of roofing material are used) and the first block row is mounted on the cement mortar starting from the corners.
 
If all horizontal control operations were carried out systematically, then building your own house from aerated concrete on your own does not pose any difficulties, because all the blocks are standardized. They have smooth surfaces, so they fit perfectly together. However, experienced builders recommend aligning each row to one level, with no minimum deviations that could adversely affect the entire structure in the future.
 
We build a house from aerated concrete with our own hands
 
Attention! It is not recommended to use broken or aerated concrete blocks for masonry.
Glue produced especially for aerated concrete blocks is used to make the next flooring after the first laying sequence. It is grown in accordance with the recommendations specified in the instructions.
 
The masonry method is determined by the recommendation that a single-layer wall is needed or laid in two or even three layers, even at the design stage. The inner walls are made in a single block and bandage vertical joints. When laying the outer two-layer walls, the seams of one row relative to the second are displaced by half a block.
 
All lines begin to be formed by shaping and aligning the angles. Glue is applied over the entire width of the previous row and on vertical walls with a trowel or trowel. A block is placed on the glue layer; this is pressed and straightened along the stretched tension to control the string from pre-laid corners. The use of glue creates the desired layer, allowing you to achieve a more even style, which contributes to the thinness of the seams.
 
Design calculations define the need for strengthening the walls and mark the necessary places. As a rule, a closed armored belt is attached to the first row according to the project, and then every four. In addition to the window unit, reinforcement is required above the door and window openings.
 
To realize the reinforcing belt, doors are prepared, in which the reinforcing rods are placed so that they are fully immersed in the recesses and welded to the corners. The strobs are filled with glue.
 
A circular reinforced beam is laid on the upper row at the level of overlap in the beam area.