First of all, we design steel villas, steel houses or prefabricated villas, prefabricated houses in line with your wishes and offer you the most suitable structure.
Steel House Production Stages
Stage 1:
First of all, we design steel villas, steel houses or prefabricated villas, prefabricated houses in line with your wishes and offer you the most suitable structure. We design the building as a prefabricated or steel structure in accordance with the regional conditions.
Stage 2:
Steel construction or prefabricated structure, which is pre-production in the factory and produced with millimeter precision by computer-controlled machines; Our structures consisting of Wall panels, Truss panel, Ceiling panel, Roof panel and carrier columns. It is shipped to the construction site after it is prepared by combining it with a rivet or bolt system.
3. Stage :
They reveal the steel skeleton by installing the panels, the main carrier system, which are made ready for assembly in our factory in a short time by our experienced and experienced personnel. Combination smart screw or bolt is used. Thanks to the mounting on bolts and self-tapping screws, the resistance against earthquakes increases. No cracks occur in the impacts of the earthquake.
4.Stage:
After the installation of the steel building is completed; The process of cladding the building exterior and interior pockets begins. Electrical and installation works are completed. Building cladding materials are determined at the time of order and building cladding is finalized with materials suitable for climatic conditions. Rockwool is definitely preferred for building insulation walls. Roof insulation is made with 10 cm thick mineral wool. The final coating can be done after 11 mm osab and membrane application is applied on the roof covering. (example: Single, Trapeze, Metal Tile or Nomal tile etc.)
5.Stage:
Priming is applied on the selected material on the exterior walls and puttying or plaster is applied. Paint is applied as a final coat. Mesh grout plaster is applied to the joints of the inner walls. After the rough plaster is finished, three snow satins are drawn. After the inner wall is completely primed, it is finished with drywall and finally paint carving.
6. Stage:
On wet floors and patio floors, the ceramic application of your choice is made in line with your request.
7. Stage:
Finally, the finishing works of the building are completed. Doors, windows, coats, sanitary ware, etc. are made and delivered in accordance with the technical specifications.